Menu
Your Cart
https://www.facebook.com/ekolivinghouse
Contact us
Eko Living House - Production and installation of one-storey and two-storiedprefabricated houses
English
Български
English
Menu
Catalog
Catalog
Prefabricated Houses up to 100 sq.m
..
See Products
Prefabricated Houses Over 100 sq.m.
..
See Products
Two Story Prefabricated Houses
..
See Products
Garages, Summer Houses, Barbeques
..
See Products
Kitchens
..
See Products
Pools
..
See Products
Documents
Project documents preparation
Stages of construction of a prefabricated house
Documents needed to start building a prefabricated house
Technologies
Basic principles
SIP Technology
Prices
Finished projects
+359 988 95 59 22
+359 898 52 63 56
Blog
All
All
Kitchens
Pools
Prefabricated Houses
Garages, Summer Houses, Barbeques
One Story Prefabricated Houses
Prefabricated Houses Over 100 sq.m.
Prefabricated Houses up to 100 sq.m
Two Story Prefabricated Houses
Contact Us
Search
Our Location
ЕКО Living House
гр. София, Бул. България 5
с.Чарган, ул. Житница №1, обл. Ямбол
Telephone
0988 955 922 или 0898 526 356
Address
Office: Sofia, Bulgaria blv.5
Office: Vilage of Chargan, Zhitnitsa str.2
Call Us
0988 955 922
0898 526 356
Looking forward to hearing from you
Your Name
Phone
Your Email
City/Village
Message
Documentation
Is the site in regulation
Is there a detailed site development plan? If the site meets the requirements of p.1, the procedure is as follows: - issue an actual plot of immovable property - issuing a full planning permission - collecting all project documents needed and introduce them to the relevant municipality, then obtaining the permission for construction
Preparing reports and documents necesary for the construction process /opening a construction line, order book and other documents including act 15.
“Standard” construction
Creating a fundament
Assembling the edifice till the stage “Structural work”
Delivery and assembling of roof coverage
Delivery and assembling of joinery
Electro installation without the accessories
Water supply installation and sewerage without the accessories
External insulation
Façade coating
Building a chimney
Delivery and assembling of gutters
Coating of walls and ceilings with plasterboard
Painting of walls and ceilings
Tiling the bathroom
Floor coating
Turnkey construction
1.Full equipment of electric installation /switches, contacts, luminaries/ 2. Full equipment of water supply installation and sewerage /mixing taps, toilets, sinks, water heater/ 3. Assembling different coverings around and on the building /stone, granite tiles/
I have read and agree to the
Privacy Policy
Submit
Okay
This site uses ''cookies'' to improve the services offered.